Cross Lake Property Potential Target

Potential Target

Potential quantity is conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain that future exploration will result in the target being delineated as a mineral resource. No economic parameters have been considered.
  • Potential target of 10-30 Mt, with Zn 0.7%-1.3%, Cu 0.12-0.22%, Pb 0.1-0.15%, Au 0.07-0.1 gpt, and Ag from 13-25 gpt.
  • Based on historical drilling, density is based on 2.8 – 3.4 and is an early approximation. Cut-off grades applied to mirror approximate $/t value of resources and reserves from the Kidd Mine.
  • Target open at depth and infill drilling between known mineralization.

Potential Target

There is a continuum of grade vs tonnage – as the deposit grows grade-cut-off can be optimized
Potential quantity is conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain that future exploration will result in the target being delineated as a mineral resource. No economic parameters have been considered. Metal equivalents are based on spot price from Feb 20th, 2025, and not long-term averages or contractual prices.

Long Section - Dip 90⁰ Dip direction 320⁰ – looking approximately northwest

Looking West

Plan