Cross Lake Property Highlights
Cross Lake Project
The Cross Lake Project is located 40 km east of Timmins. The project is about 12 km south of Highway 101. The focus is to confirm and expand on historic drilling which has demonstrated a steeply dipping Ag-Zn VMS deposit similar to Kidd Creek.
Base Metal Potential
- Drilling occurred mostly in the late 1990’s by Cross Lake Minerals. Currently 39 drillholes for 17,465m are believed on the property, however at this point additional validation is required.
- The deposit is Zinc and Silver heavy, however the moderate gold values add a lot of weight.
- The deposit remains open in many directions, especially at depth.
Key Features
Land Package
3 key claims with critical historic drilling.
Abundant historic documentation to accelerate the development of this project, both in the property and surrounding area.
Including:
- Geophysics
- Mapping and Geochem
- Mineralogical review
- Drilling and analysis
Grade and Width
Grade values and widths comparable to values seen at the Kidd Creek Mine
Established Mining Camp
Abundant mining infrastructure, power and workforce. The Kidd Mine expected to close production 2026 has extensive infrastructure for Base Metal production
Targets
Cross Lake deposit sits right below the over burden, (near surface and steeply dipping)
Established Mining Camp
Mineralization has not been constrained at depth, holes up to 800m depth still intersecting mineralization




